Radiated spectrometry in method of ICP

Summary

Preliminary installing of ICP system in organization by engineer Khatibi from Jam Ara Company whihcis a agent of Juben Ion Co

Description

Introduction Preliminary installing of ICP system in organization by engineer Khatibi from Jam Ara Company whihcis a agent of Juben Ion Co.  from France in Iran, was carried out in 1373, as monochromator, polychromator, plasma torch, spectrometer body (meta covers) and the table in front of system was installed. However complete installation of this system was in responsibility of Juben Ion engineers. This company did not accept departure of its experts to Iran till long times. In Bahman month in 1374 an agreement was conformed between Geological Survey of Iran and BRGM from France and Juben Ion Company that as a result of that Juben Ion company became responsible for expert sent out for complete installing of ICP system in GSI and the centers. According to this agreement, BRGM became responsible for expert sent out to Iran (after ending of work of expert in J.Y) in time of two weeks for installation of automatic system of sample preparation (robomisol) and charly robot and training of three persons of experts of organization (from one center, one person). This note of agreement is changed in Ordibehesht month in 1377 with writings in this shape that two experts of BRGM is sent out, one expert for installation of automatic system for installation of ICP enclosures of of ICP system such as Gilson, Charly Robot, system of flow control of Argon Gas in time interval of two weeks. Inspite of abundant followings in these years, sent out of experts from Juben Ion Co. was delayed to Esfand month of 1376. In late of Esfand 1376, Mr. Laurin was entered to Iran and paid to a set of monochromator and polychromator optical systems ad control of light path and setting of plasma torch. By following and accomplishment of writngs and many phone calls in Shahrivar 1377 from Christophe Bouriin and Tierry Laurioux. BRGM experts have been come from France to Iran and for two weeks installation of robot system and geoplasma software, Gilson pump, control of gas flow system, moistrizig system of Argon gas and for installation of Charley system of robot had to changes and amendments.